gaqneuro.blogg.se

Systems layers rapidshare premium
Systems layers rapidshare premium













systems layers rapidshare premium

– After ventilating, apply a two-part HS clear coat -1- over the entire repair surface. – After the touch-up painting the connection area and the remaining surfaces (starting from the new part) -1- in 1.5 spray applications (standard process) are painted.

#Systems layers rapidshare premium archive#

Pay attention that the spray application is applied in the area previously shifted forward -1- to archive an even effect. – In the second step a further reduced spray application -2- follows without a drying time.

systems layers rapidshare premium

– Then the first base paint spray application -1- is lightly applied from the blended area into the wet touch-up additive -2. Cyberlink powerdirector video editing software. Note Pay attention that the blended area is large enough. Method 1: Repair process, touch-up the neighboring surfaces (for example color matching fender/door) – Apply 1-2 preliminary spray applications of the Touch-Up Additive For Aqua Premium -LVM 035 100 A3-2- in the blended area with normal spray pressure on the old paint/filled surface -1. Special Instructions Insulate sanded-through areas with Two-Part Wash Primer -LHV 043 000 A2- and then fill with Two-Part HS Performance Filler. Refer to → Chapter „Dust Cloth -VAS6177-“.

systems layers rapidshare premium

When using a dust extraction, use next generation towels with an effective light adhesive formula to minimize the risk of chemical or adhesive residue (for example, Dust Cloth -VAS6177-). – Allow wet-sanded surfaces and cleaned surfaces to dry completely. – Wipe off any residual silicone remover with a lint-free cloth, leaving no streaks. Cleaning – Clean the entire surface thoroughly with Silicone Remover -LVM 020 000 A5- to remove dust, sanding residue and other dirt. Note If beading, edges or grip recesses are present, use a sanding pad beforehand. – Sand the adjacent area (around the vehicle parts and the repair area) thoroughly with P1000-3000 sandpaper, only wet sand. Preparation – Sand the repair area with P500-P600 grit sandpaper or wet-sand with water-resistant P800-1000 sandpaper. Pre-treatment of base surfaces: – Clean the factory or old paint or two-part HS filler thoroughly with Silicone Remover -LVM 020 000 A5- or Silicone Remover, Long -LVM 020 100 A5. Application Instructions Base Surface Suitable base surfaces: Two-Part HS Filler Intact old paint For plastic surfaces prime with Glazing Adhesion Promoter - ALO 822 000 10- and rework with elastified Two-part HS. / / Aqua Premium System, Touch-Up System for Two Layer Colors Edition 04/2013 Product Description/Objective To achieve an optically flawless color shade transition in the blended area or adjacent parts, for example fender/door. The Auto-align Layers command quickly analyzes details and moves, rotates, or warps layers to.















Systems layers rapidshare premium